Bored Pile Driver For Precast Concrete Pile

CONSTRUTION SITE: WENZHOU CITY, CHINA

CONSTRUCTION EQUIPMENT: JZB240 walking type pile frame with dual power heads

WORKING METHOD: bored plant pile driver

BORED DEPTH: 68m

Drive the first auger into the ground, and lift up, then take the auger bit to the second auger to drive the rest part.

after finishing the total 68m hole, and plant the concrete pile into the hole.